EV News Hubb
Advertisement Banner
  • Home
  • Electric Vehicle Market
  • Electric Car
  • Electric Bikes
  • Contact us
No Result
View All Result
  • Home
  • Electric Vehicle Market
  • Electric Car
  • Electric Bikes
  • Contact us
No Result
View All Result
EV News Hubb
No Result
View All Result
Home Electric Car

Recommendations To Discretionary Grant Programs For Charging & Fueling Infrastructure

admin by admin
November 13, 2022
in Electric Car


The Joint Office of Energy and Transportation successfully launched the National Electric Vehicle Infrastructure (NEVI) Formula program and is designing the competitive discretionary grant programs.

The Corridor Charging Grant Program and the Community Charging Grant Program are due by statute to launch by November 15, 2022.

Forth, in partnership with GRID Alternatives, is proposing nine recommendations to the Joint Office in an effort to support the design and implementation of these discretionary grant programs. These considerations encourage the development of grant programs to:

1.Center Equity — Charging investments must be designed to meet the needs of those who face the most barriers to accessing electric vehicles (EVs). This includes drivers from rural, low-income, and communities of color.

2. Maximize Flexibility — Discretionary grant applications that center equity will require the greatest degree of flexibility allowed by statute, to model “wrap-around programming.” We strongly recommend that the Joint Office allow the broadest possible range of costs to qualify and/or required matching funds.

3. Priority Needs and Best Practices – Over the past decade, the U.S. Department of Energy (USDOE) and other stakeholders have developed expertise on optimal deployment of public charging funds to maximize access to EVs and accelerate the transition to electric mobility. The Joint Office should ensure that discretionary grant programs are built on this foundation and direct applicants to use these resources, tools, and best practices

4. Build on Best Practices — Over the past decade, the U.S. Department of Energy (USDOE) and other stakeholders have developed expertise on optimal deployment of public charging funds to maximize access to EVs and accelerate the transition to electric mobility. The Joint Office should ensure that discretionary grant programs are built on this foundation and direct applicants to use these resources, tools, and best practices.

5. Set Clear Evaluation Metrics — We encourage the Joint Office to define a short, clear, well-defined set of metrics for scoring and evaluating discretionary grant applications. We encourage you to include metrics such as:

  • Estimated increase in equitable access to EVs
  • Estimated reduction in transportation costs
  • Estimated reduction in pollution and greenhouse gas emissions
  • Demonstrated level of community engagement and support to fulfill Justice40 requirements
  • Leveraged funding from other sources
  • Safety, reliability and ease of access of the charging infrastructure
  • Long-term operation and performance measures

6. Clarify Non-Corridor Funding — The country needs charging that will provide access to EV drivers in their everyday lives — where they live, work, and play. This is particularly critical for underserved communities where drivers are less likely to have easy access to overnight home charging. Therefore, we strongly recommend that guidance for the Corridor Charging Grant Program be less restrictive than NEVI formula funding.

  • 95.1% of trips are less than 30 miles round trip. Hence, we suggest allowing charging within 15 miles of a designated corridor to qualify
  • We also recommend discouraging applications for fast charging designed to serve corridor travel – projects that could be funded with NEVI Formula Funds
  • We also recommend that the Community Charging Grant Program clarify that these funds will exclusively be available for charging infrastructure that does not qualify for either the Corridor Charging Grant Program or NEVI Formula Funding.

This will reduce duplication and expand access to the maximum funding for rural, underserved communities, and other charging needs for those not along major fast-charging corridors.

7. Help Electrify EVs of All Types – The $7.5 billion provided by NEVI over five years is a substantial and transformative investment in building a national charging network to increase consumer confidence in buying EVs. However, as many analysts have noted, it is far from sufficient to fully build that network.

Projects that seek to ensure that passenger vehicle charging systems are also useful to other modes should be permissible and encouraged. To the extent possible, charging locations should also be designed to allow for use by medium- and heavy-duty vehicles where appropriate, since these vehicles can utilize the same chargers as passenger cars.

8. Provide Technical Assistance — A “first come first serve” approach will likely serve those who have had the most resources, access to information, and prior experience with transportation electrification. By contrast, historically underserved and rural communities with fewer resources and experience with electric transportation will need substantial support to compete.

We believe it is critical that Federal Highway Administration provide substantial outreach, education, and technical assistance from trusted brand-neutral sources to help communities apply for and effectively utilize these funds.

9. Encourage Partnerships – Many historically underserved communities are under-equipped to compete for grant funds or manage grant-funded charging projects. In the long term, we should work to help these communities build capacity. For the next several years, however, we encourage providing maximum flexibility for communities to partner with diverse third parties – nonprofits, electric utilities, for-profit companies, or others to develop and manage programs.

Catch our webinar on “Using Federal Charging Funds Equitably & Effectively” to learn more about the discretionary grant programs.

By: Jeff Allen, courtesy of Forth

8 Key Steps For States Forth Executive Director,
Jeff Allen

Jeff Allen has served as Executive Director of Forth since its founding in 2011. Forth is a nonprofit organization with a mission to electrify transportation by bringing people together to create solutions that reduce pollution and barriers to access. More information can be found at www.forthmobility.org

 

Appreciate CleanTechnica’s originality and cleantech news coverage? Consider becoming a CleanTechnica Member, Supporter, Technician, or Ambassador — or a patron on Patreon.

 


Don’t want to miss a cleantech story? Sign up for daily news updates from CleanTechnica on email. Or follow us on Google News!

 


Have a tip for CleanTechnica, want to advertise, or want to suggest a guest for our CleanTech Talk podcast? Contact us here.


Advertisement

Advertisement Banner

 






Source link

Previous Post

Awesomely Weird Alibaba EV of the Week: Move over, Tesla Semi – I want to buy this electric big rig!

Next Post

Elon Musk’s remote work policy for Twitter is the same as Tesla & SpaceX

Next Post

Elon Musk's remote work policy for Twitter is the same as Tesla & SpaceX

Tesla wants EVs of all brands to use its charging connector

Advertisement Banner

Recommended Post

Blix Sol Eclipse Electric Bike Review 2023

by admin
February 2, 2023
0

Charged EVs | New Zealand firm offers improved LFP battery packs for Nissan Leaf

by admin
February 2, 2023
0

Big batteries are now powering large tower cranes in London – a UK first

by admin
February 2, 2023
0

Volvo Reportedly Plans Turning All Its Core Models Into EVs By 2026

by admin
February 2, 2023
0

Mapping federal charging network, EV charging tax, Mazda on EV range: Today’s Car News

by admin
February 2, 2023
0

Tesla Model Y Long Range delivery estimate moved to March-May 2023

by admin
February 2, 2023
0

Yes, There Will Be Enough Biofuels; No, They Won’t Impact Food Supplies

by admin
February 2, 2023
0

Magnum Nomad Review 2023 | Electric Bike Report

by admin
February 1, 2023
0

© 2022 EV News Hubb All rights reserved.

Use of these names, logos, and brands does not imply endorsement unless specified. By using this site, you agree to the Privacy Policy and Terms & Conditions.

Navigate Site

  • Home
  • Electric Vehicle Market
  • Electric Car
  • Electric Bikes
  • Contact us

Newsletter Sign Up

  • Home
  • Electric Vehicle Market
  • Electric Car
  • Electric Bikes
  • Contact us

© 2022 EV News Hubb All rights reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In